
Dell PowerEdge R760 Rack Server
Two-socket 2U mainstream server with 4th/5th Gen Xeon, DDR5 and up to 24 NVMe drives

Dell PowerEdge, HPE ProLiant, Supermicro and Lenovo ThinkSystem configured to order

Two-socket 2U mainstream server with 4th/5th Gen Xeon, DDR5 and up to 24 NVMe drives

Air-cooled 6U eight-way GPU server for NVIDIA HGX H100/H200, AMD MI300X or Intel Gaudi 3
Versatile 2U two-socket Xeon server with 32 DDR5 slots, PCIe Gen5 and flexible drive cages
Two-socket AMD EPYC 2U server with 24 DDR5 slots, PCIe Gen5 and dense NVMe or GPU options

Air-cooled 8U NVIDIA HGX H100/H200 8-GPU system with dual Xeon and 8 PCIe 5.0 NIC slots

Two-socket 2U Xeon server with up to 40 drive bays, 12 PCIe slots and 3 double-wide GPUs
Our server range focuses on the current rack platforms that enterprises and hosting providers standardise on: Dell PowerEdge R760 and the GPU-dense XE9680, HPE ProLiant DL380 and DL385 Gen11, Supermicro GPU systems and Lenovo ThinkSystem SR650 V3. Each is configured to order with the processors, memory, storage, network adapters and GPUs your workload needs.
Typical buyers are IT departments refreshing virtualisation clusters, hosting and colocation providers, system integrators and AI start-ups building their first on-premises compute. We help translate workload requirements into a bill of materials and compare equivalent configurations across vendors.
Servers are supplied through licensed partners of InTechnologies FZCO who issue the contract and invoice. We handle supplier selection, consolidation in Dubai Airport Freezone and DDP or DDU delivery, and we check export rules for configurations that include high-end GPUs.
Yes. Send the vendor bill of materials or the configuration code and we will quote the same build, or propose an equivalent from another manufacturer if lead time is better.
All servers are new, factory-sealed units with the manufacturer warranty registered for the destination country. Extended support contracts can be added to the quotation.
Standard configurations ship in two to six weeks from order confirmation. GPU-dense systems depend on accelerator allocation and can take longer; we confirm dates with every quotation.